MODEL OF THE LIFE CYCLE OF PROJECTS OF INDUSTRIAL OBJECTS CONSTRUCTION

Authors

Abstract

In the framework of the study, the authors have considered in detail the theory and practice of implementing projects for the construction of industrial objects. It is proposed to define the data of the projects, describe the specific characteristics inherent in these projects. The problem aspects of the management of these projects are determined. The main stages of the life cycle of projects for the construction of industrial objects from the point of view of the executed work and necessary investments are defined and described. Developed cascade lifecycle model projects construction of industrial objects of feedback curve and investment, unlike existing based on a fundamentally new approach to data management projects based on logic procurement project resources.

Keywords: project management, specific and unified resources, life cycle model, projects of construction of industrial objects.

Author Biographies

, О.M. Beketov National University of Urban Economy in Kharkiv, Ukraine

доктор технічних наук, професор, проректор з наукової роботи

, О.M. Beketov National University of Urban Economy in Kharkiv, Ukraine

аспірант

, О.M. Beketov National University of Urban Economy in Kharkiv, Ukraine

кандидат технічних наук, начальник Науково-дослідної частини

References

Література

Руководство к своду знаний по управлению проектами (руководство PMBOK®) [Текст]. – Project Management Institute, 2008 – 496 с.

Танака, X. Повышение отдачи от капиталовложений в строительство и управление проектами: опыт и перспективы Японии [Текст] / Хироши Танака // Управление проектами и программами, – 2006, – № 1 (05). – С. 24-40.

Морозов, В.В. Розробка моделей визначення, формування та управління конфігурацією портфелів інвестиційних проектів будівельних корпорацій [Текст] / В.В. Морозов, К.М. Осетрин // Управління проектами та розвиток виробництва. – 2005. – № 4(16). – С. 38-45

Рибак, А.І. Аналіз механізмів фінансування будівельних проектів в галузі житлового будівництва. Ринковий механізм фінансування [Текст] / А. І. Рибак., І. Б. Азарова // Управління розвитком складних систем. – 2014. – № 18. – С. 88 – 97.

Antunes, R. Gonzalez, V. (2015). Production Model for Construction: A Theoretical Framework. Buildings, 5 (1), 209–228.

Levy, S. (2012). Project Management in Construction; McGraw-Hill: New York, NY, USA, 478.

Walsh, K., Sawhney A., Bashford H. (2007). Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), 254-261.

Hossain, M., Chua, D. (2014). Overlapping design and construction activities and an optimization approach to minimize rework. International journal of project management, 32(6), 983-994.

Bhoyar, S., Parbat, D. (2014). Optimal scheduling for repetitive construction projects with multiple resource crews. S. Int. J. Emerg. Technol. Adv. Eng, 4, 302-307.

Караханова, Н.Р. Содержание фаз жизненного цикла проекта [Электронный ресурс] / Н.Р. Караханова // Экономика и менеджмент инновационных технологий. – 2015. – № 1. – Режим доступа:

http://ekonomika.snauka.ru/2015/01/6933

Шевченко, С.Ю. Управление жизненным циклом инновационного продукта [Текст] / С.Ю. Шевченко // Креативная экономика. – 2008. – Том 2. – № 1. – С. 20-29.

Дорохина, Е.Ю. Жизненный цикл строительного проекта: моделирование затрат [Текст] / Е.Ю.Дорохина, Д.А. Качурин // Фундаментальные исследования. – 2017. – № 8-1. – С. 159-163.

References

Guidance for REDD knowledge in management of projects (guidance PMBOK® (2008)). Project Management Institute, 496.

Tanaka, H. (2006) Increase of return on investment in construction and project management: experience and prospects of Japan. Project and Program Management, 1 (05), 24-40.

Morozov, V. (2005) Development of definition and configuration management portfolios models of investment projects construction corporations Project management and production development, 4 (16), 38-45.

Rybak A., Azarova I. (2014). Analysis of mechanism soffinancing of buildprojectsinarea of housing building. Market mechanism of financing. Management of development of complex system, 18, 88–97.

Antunes, R. Gonzalez, V. (2015). Production Model for Construction: A Theoretical Framework. Buildings, 5 (1), 209–228.

Levy, S. (2012). Project Management in Construction; McGraw-Hill: New York, NY, USA, 478.

Walsh, K., Sawhney A., Bashford H. (2007). Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), 254-261.

Hossain, M., Chua, D. (2014). Overlapping design and construction activities and an optimization approach to minimize rework. International journal of project management, 32(6), 983-994.

Bhoyar, S., Parbat, D. (2014). Optimal scheduling for repetitive construction projects with multiple resource crews. S. Int. J. Emerg. Technol. Adv. Eng, 4, 302-307.

Karakhanova, N. (2015). Contents of the phases of the life cycle of the project. Economics and management of innovative technologies, 1. Retrieved from

http://en.wikisource.org/wiki/Special:WhatLinksHere

Shevchenko, S.(2008). Managing the life cycle of an innovative product. Creative Economy, 2(1), 20-29.

Dorokhina, E., Kachurin, D. (2017). Life cycle of the construction project: modeling of costs. Fundamental research, 8-1, 159-163.

Published

2018-03-30

How to Cite

, , & . (2018). MODEL OF THE LIFE CYCLE OF PROJECTS OF INDUSTRIAL OBJECTS CONSTRUCTION. Municipal Economy of Cities, (139), 10–14. Retrieved from https://khg.kname.edu.ua/index.php/khg/article/view/5093

Most read articles by the same author(s)

1 2 > >>