ESTIMATED PROJECT DECIDED BUILDINGS (STRUCTURES) ON INDICATORS OF INITIAL COST AND REPAIR COSTS

Authors

  • О. Д. ОВСІЙ

Abstract

A method for assessing the design decisions buildings (structures) in terms of initial cost and the cost of repair of structures (elements) during operation. For clarity, the proposed method is an example of comparative evaluation of three different options for building hotels constructive solution.