DESIGN FEATURES FOR THE IMPLEMENTATION OF THE CAMERA VEXATION OF TWO-STAGE TECHNOLOGY PRODUCING GYPSUM BINDERS
Abstract
The basic principles of equipment for the implementation of the two-stage heat treatment technology gypsum . In the first firing step carried out particulate gypsum in a turbulent two-phase flow . In the second step heat treatment is carried out in the temperature equalization chamber gypsum particles longing for α- calcium sulfate hemihydrate . Particular attention is paid to the motion of material particles in a cylindrical chamber and the discharge of longing.
Downloads
How to Cite
Issue
Section
License
The authors who publish in this collection agree with the following terms:
• The authors reserve the right to authorship of their work and give the magazine the right to first publish this work under the terms of license CC BY-NC-ND 4.0 (with the Designation of Authorship - Non-Commercial - Without Derivatives 4.0 International), which allows others to freely distribute the published work with a mandatory reference to the authors of the original work and the first publication of the work in this magazine.
• Authors have the right to make independent extra-exclusive work agreements in the form in which they were published by this magazine (for example, posting work in an electronic repository of an institution or publishing as part of a monograph), provided that the link to the first publication of the work in this journal is maintained. .
• Journal policy allows and encourages the publication of manuscripts on the Internet (for example, in institutions' repositories or on personal websites), both before the publication of this manuscript and during its editorial work, as it contributes to the emergence of productive scientific discussion and positively affects the efficiency and dynamics of the citation of the published work (see The Effect of Open Access).